Architecture

World's longest immersed tunnel lets visitors drive under the Baltic Sea

World's longest immersed tunnel lets visitors drive under the Baltic Sea
The Fehmarnbelt tunnel will open in 2029 and is expected to be in operation for at least 120 years
The Fehmarnbelt tunnel will open in 2029 and is expected to be in operation for at least 120 years
View 6 Images
The Fehmarnbelt tunnel's construction will require 360,000 tons of rebar, which is the equivalent of almost 50 times the weight of the Eiffel Tower's metal structure
1/6
The Fehmarnbelt tunnel's construction will require 360,000 tons of rebar, which is the equivalent of almost 50 times the weight of the Eiffel Tower's metal structure
The Fehmarnbelt tunnel will connect Denmark and Germany
2/6
The Fehmarnbelt tunnel will connect Denmark and Germany
The Fehmarnbelt tunnel involved dredging the Baltic Sea's bed
3/6
The Fehmarnbelt tunnel involved dredging the Baltic Sea's bed
The Fehmarnbelt tunnel will open in 2029 and is expected to be in operation for at least 120 years
4/6
The Fehmarnbelt tunnel will open in 2029 and is expected to be in operation for at least 120 years
The Fehmarnbelt tunnel will consist of 79 standard and 10 smaller sections of tunnel
5/6
The Fehmarnbelt tunnel will consist of 79 standard and 10 smaller sections of tunnel
The Fehmarnbelt tunnel sections are being created at onshore facilities and then floated using a barge and sunk into position, with underwater operations monitored by ROVs according to the renders
6/6
The Fehmarnbelt tunnel sections are being created at onshore facilities and then floated using a barge and sunk into position, with underwater operations monitored by ROVs according to the renders
View gallery - 6 images

An ambitious underwater road and rail tunnel is currently under construction in Europe that will link Germany and Denmark. Named the Fehmarnbelt tunnel, it will cross an 18-km (roughly 11.2-mile) stretch of the Baltic Sea.

The Fehmarnbelt tunnel (aka Fehmarn Belt fixed link) is being created by Femern A/S, Rambøll, Arup and TEC, and is described by the team as the world's longest immersed tunnel (i.e. a tunnel built elsewhere and then sunk into place) and the world's deepest immersed tunnel with road and rail traffic. The immersed part is important as there are longer undersea tunnels, such as the Channel Tunnel, for example, but it's still an extraordinary undertaking.

Once complete, it will connect Rødbyhavn in Denmark with Fehmarn in Germany, and will be the shortest route between Scandinavia and the rest of Europe. Travelers will either take a seven-minute train journey or a 10-minute car drive to cross the Fehmarn Belt, replacing a trip that would otherwise have taken 45 minutes by ferry.

To put its size into perspective, the construction of the tunnel will require 360,000 tonnes (396,832 short tons) of rebar, which is the equivalent of almost 50 times the weight of the Eiffel Tower's metal structure. The build site at the Danish side is the size of 373 soccer pitches. Up to 70 vessels were involved in the dredging of the tunnel trench, which is also 18 km (11.2 miles). In total, around 12 million cubic meters (almost 424 million cubic ft) of soil has been dredged from the seabed.

The Fehmarnbelt tunnel will consist of 79 standard and 10 smaller sections of tunnel
The Fehmarnbelt tunnel will consist of 79 standard and 10 smaller sections of tunnel

The immersed tunnel itself consists of 79 standard and 10 special sections. Each of the standard sections weighs around 73,000 tonnes (80,468 short tons) and has a length of 217 m (711 ft), with a width of 42 m (138 ft) and a height of 10 m (33 ft). The smaller special sections are under half the length but are a little wider and higher. The tunnel sections are being cast on land and then floated into position using a barge, before finally being submerged and sealed on the sea bed at a depth of up to 40 m (131 ft).

The Fehmarnbelt tunnel's budget so far is around DKK8.4 billion (roughly US$1.2 billion). Denmark's King Frederik X recently inaugurated the first section of the tunnel during a special ceremony and it will be sunk in the coming weeks.

The Fehmarnbelt tunnel's construction will require 360,000 tons of rebar, which is the equivalent of almost 50 times the weight of the Eiffel Tower's metal structure
The Fehmarnbelt tunnel's construction will require 360,000 tons of rebar, which is the equivalent of almost 50 times the weight of the Eiffel Tower's metal structure

The Fehmarnbelt tunnel is expected to be completed in 2029 and to be in operation for a minimum of 120 years. Check out this video explainer for more information.

Fehmarnbelt Tunnel - Immersion of a tunnel element

Sources: Fehmarnbelt tunnel, Arup

View gallery - 6 images
3 comments
3 comments
Tech Fascinated
It looks so simple in the video but it must be a massive logistics operation -- especially in the deepest sections.
guzmanchinky
I took that ferry, it's annoying. I look forward to this!
pete-y
The video is worth a look. Boggling engineering!